The good news is that my latest Energy Prophecy platform prototype lasted for three months. It made it through heavy snow, heavy winds and ice storms. The blades were made of 1' by 3' flooring boards. In a ironic twist my prototype of the future of green energy was brought down by Global Warming. It rained for 5 straight days in the month of March in Minnesota. The blades became water logged and started to fall apart. Went to do wind testing on round lake in Eden Prairie and there were lakes on the ice. It's a small lake in a depression and the wind was not what I hoped. The wind testing did not go well at all. The only good news is that I might get some pictures in a local paper. I am thinking it is time to start bringing a team together and maybe the pictures might draw some interest.
Ronald P Ackerman