Welcome Guest Login or Signup
LINKS & RESOURCES | FLASHCHAT | INSTANT MESSENGER | BOOKMARK
 

BLOGS  
 
RSS
E P Project 7
Posted On 12/01/2011 01:51 PM by Ackerman18
The overweight 38 inch Energy Prophecy Prototype sheared off another 1/2 inch deck lag bolt. These lag bolts are designed for heavy loads on decks. I have had them break on other prototypes in the past and I will have to find something stronger to use. It must be the combination of torque,weight and movement that makes them fail. It is December in Minnesota and I will need to start over from scratch in the spring on the 38 inch wind testing project. I am going to move my testing back in doors and do some high torque situation testing. I will build a small Wind Turbine prototype and a small Energy Prophecy Prototypes with the same length blades. I am not sure if a Wind Turbine Will turn at any wind speed under such a high torque situation. I am still working massive overtime as the flower boy wonder so I can not give you a time table on when the testing will start. ackerman18

Bookmark:



Viewing 1 - 1 out of 1 Comments

From: jimmight
02/08/2012 12:55 AM

New
Federal Government regulations will spark a resurgence of consumers
purchasing solar hot water systems, according to the renewable energy
industry’s peak body.

Testking 70-663 Testking 000-977 Testking 70-291 Testking 642-072 Testking 117-102 Testking 70-595 Testking SK0-003 Testking 642-975





 Copyright 2008 All Rights Reserved    My Energy Friends - Alternative Energy - Renewable Energy    TLA, Inc.