I have reconfigured the power transfer system on the 38 Inch Energy Prophecy Prototype.It will now be a pulley and drive belt system hooked to the 25 to 1 Generator. The good new is I changed it out without causing any damage to the super Structure or Main shaft. The bad news is while I was doing the change over I realized how over weight this Prototype is. The blades are also to crowded near the shaft. This prototype will need to be tweaked to correct these problem as well as I can without starting over. I will also need to build a matching power transfer system for the 38 inch Wind Turbine Prototype. Winter is coming to Minnesota and there is a lot of work to do on these two prototype. The one on one testing of the 38 inch Prototypes is cancelled for now. I have basically completed the E P Project Video which is about 5 1/2 minutes long. It is on video tape and I'm Trying to get it get it converted to a computer disk format. I was waiting for the video of testing of the 38 inch Prototypes, But I now plan on posting it soon.( included is the E P Rap) ackerman18